Файърхолд - View more

Fajyrhold

Design, installation, and maintenance of fire alarm systems, voice evacuation systems, and fire hydrants. "Fire Safety" discipline. Throughout Bulgaria.
Файърхолд

About Us:

"FIREHOLD" Ltd. is a licensed engineering company and a leader in fire safety for construction projects and operational sites throughout Bulgaria. We manage the entire fire safety cycle—from preparing investment project documentation for the “Fire Safety” section (FS), through the supply, installation, and configuration of certified systems, to commissioning and scheduled maintenance. Our mission is to help projects pass state acceptance inspections without remarks and to provide reliable protection for life and property.

The company holds a permanent national permit issued by the General Directorate for Fire Safety and Civil Protection No. 1255/23.10.2024 for carrying out fire safety activities under the Ministry of Interior Act. All our solutions comply with Ordinance No. Iз-1971 (construction and technical rules), Ordinance No. 8121з-647 (fire safety during operation of sites), and the European standards series BDS EN 54 and BDS EN 671. We design intelligent installations tailored to your construction schedule.

  • Fire alarm systems (FAS)
  • Voice alarm systems for fire emergencies
  • Fire hydrants and installations
  • Fire Safety project documentation
  • Scheduled post-warranty maintenance
  • Evacuation diagrams and plans
  • Staff training and drills
  • Integration with elevators and BMS
  • Hybrid low-voltage installations
  • 24/7 emergency response

Файърхолд

Fire Safety Systems:

Fire alarm systems:
We install conventional and addressable fire alarm systems for early fire detection [1.12]. The systems include optical smoke, heat, and combination detectors, manual call points, and fire alarm control panels, which can be integrated with smoke extraction, elevators, and the building’s access control system [1.12].

Voice alarm systems for fire emergencies:
We design systems for automatic voice announcements and evacuation management [1.12]. They are zoned according to fire compartments to ensure maximum speech intelligibility and priority for fire announcements through a microphone station [1.12].

Fire hydrants and water installations:
We perform hydraulic calculations, install pump sets and pressure booster systems, and construct internal fire hydrants and fire water mains in full compliance with BDS EN 671 [1.12].

REGULATORY COMPLIANCE AND MINISTRY OF INTERIOR ORDINANCES

The design, installation, and maintenance of fire protection systems in the Republic of Bulgaria are strictly regulated activities that allow no compromises. “FIREHOLD” Ltd. carries out every project in full compliance with the applicable legislation and the requirements of the Ministry of Interior’s General Directorate for Fire Safety and Civil Protection. A key foundation of our design practice is Ordinance No. Iз-1971, which sets out the construction and technical rules and standards for fire safety. This ordinance classifies buildings according to their functional fire hazard and determines when automatic fire detection, voice alarm systems, and internal fire hydrants are mandatory.


Файърхолд

IMPLEMENTATION STAGES AND ENGINEERING

To ensure the site is commissioned smoothly and the Act 16 certificate is signed without remarks, we follow a clearly defined work sequence aligned with the main construction schedule. The process begins with a detailed site inspection and preparation of technical requirements together with the investor, during which specific fire risks in the premises are assessed—from high-rack storage areas to underground car parks and evacuation corridors.

The next stage is the design itself, during which our engineers develop detailed cable-routing diagrams, size detection zones, calculate siren sound levels, and perform hydraulic calculations for the flow rate and pressure of the fire water main. During installation, our teams lay fire-resistant cables and install detectors, control panels, fire cabinets, and pump sets. Each stage is coordinated with the other low-voltage and electrical contractors on site to avoid delays. Once installation is complete, commissioning begins, including software programming of detector addresses and configuration of relay modules controlling elevators, ventilation, and smoke extraction.

72-HOUR TESTING AND COMMISSIONING

Conducting 72-hour tests under real operating conditions is a legal requirement and the most important stability test for any fire protection system before the state acceptance commission inspection. During this 72-hour test period, the system operates continuously and is monitored to ensure there are no false alarms caused by dust, air currents, or software errors. Our engineers carry out practical tests using test aerosols and smoke generators to check each detector’s response time and ensure signals are correctly transmitted to the fire alarm control panel.

During the 72-hour tests, it is especially important to test integration with the building’s other engineering systems. Checks are made to confirm that activation of a fire detector automatically disables access control (to unlock evacuation doors), that elevators are recalled to the ground floor with doors open, that smoke extraction fans activate, and that a signal is sent to the voice alarm system for controlled zone-by-zone evacuation. The results of these comprehensive tests are recorded in an official 72-hour test report, signed by the investor, designer, and supervising company, and included as a mandatory part of the documentation for the State Acceptance Commission for Act 16.

FIREHOLD /"FIREHOLD" Ltd./
Design, installation, and maintenance of fire alarm systems, voice alarm systems, and fire hydrants. Fire Safety section [1.12].
73 Yane Sandanski St., Kresna 2840, Republic of Bulgaria [1.12]
Tel.: +359 877 038 900
Email: contact@firehold.bg
Website: firehold.bg/bg
Services:
• Automatic fire alarm systems (FAS)
• Voice alarm systems for fire emergencies
• Internal fire hydrants and fire water mains
• Preparation of Fire Safety project documentation
• 72-hour system testing
• Fire evacuation diagrams and plans
• Scheduled maintenance and system testing
• Staff training and technical briefings
• Hydraulic calculations for water installations
• 24/7 emergency response


Fajyrhold - industry:


Fire systems,