Яна 2007 ЕООД  itemprop=

IAna 2007 EOOD

Yana 2007 EOOD is your trusted partner in infrastructure construction and the energy sector. The company specializes in heavy construction machinery and equipment rentals, comprehensive earthworks and excavation services, and high-precision construction of electrical power lines.
Sofia, kv. Gorna bania, ul.Bojcho Bojchev 25





About Us: Our company was established in 2007, with its main activities being the construction, maintenance, repair and reconstruction of telecommunications and electricity distribution networks, which are an integral part of and of exceptional importance to the infrastructure development of the respective regions in the country.“YANA 2007” Ltd. has its own well-equipped material and technical facilities, including office and work premises, a service workshop, warehouse facilities, the necessary technical equipment and qualified personnel.The company is a member of the Bulgarian Construction Chamber:Certificate No. I-006539/18.12.2008 for construction works, Group I, Categories 4 and 5Certificate No. III-001291/18.12.2008 for construction works, Group III, Category 3 Projects: Over the years of its operation, “YANA 2007” Ltd. has established itself as a reliable and loyal partner. The company's achievements and experience are evidenced by its long-standing contacts and cooperation with VIVACOM (BTC), TRACE SOFIA, SEW (SSV), PATSTROY, ROADS AND BRIDGES, GBS INFRASTRUCTURE CONSTRUCTION AD, ELECTROBILD, SOFIA ELECTRIC TRANSPORT EAD, SK 13 TRANSTROY AD, DIMOV COMPANY Ltd., TRACE ROADS EAD, TRACE-SVOGE Ltd., STANILOV Ltd., ARGOGROUP EXACT Ltd., BULSATCOM AD, NURTS Bulgaria EAD, SIENIT HOLDING, NEXTON PROPERTIES EAD, GP GROUP Ltd., STRABAG EAD, TRACE SOP, PS AI AD, TRACE ROAD CONSTRUCTION AD, Coolbox AD, TRACE BG EAD, VDH AD, SOFIA MUNICIPALITY, TRACE PROPERTIES Ltd., TRACE GROUP HOLD AD, ARKEL SOFVEN Ltd., METALCOM CONSTRUCT Ltd., BOFI EL Ltd. and many other companies operating in related fields, as well as by the projects completed: The company has completed numerous projects in Sofia and throughout the country.- Design and construction of a new telecommunications network and reconstruction of the existing network in the Sofia districts of Kubratovo, Orlandovtsi and Malashevtsi. The company also played a major role in constructing the same network in Kozloduy. Numerous emergency repairs and telephone cable connections serving VIVACOM (BTC) customers throughout Sofia have also been carried out.- Construction of fibre-optic cable lines: Sofia (Druzhba district); Yambol – Bezmer Airport; Mezdra – Vratsa; Pernik – Radomir; Sandanski – Kulata.- Sofia Metro construction. On the First Metro Line, in the area of Metro Stations 12–13, the company carried out the reconstruction of the telephone duct network and communication cables, medium-voltage and low-voltage power supply cables, as well as street lighting.- “Landscaping of the areas surrounding the new passenger terminal building at Sofia Airport / Terminal 2.”- Construction of the four-arm road junction in the village of Dolni Bogrov on Road I-8, including reconstruction of the telecommunications network and street lighting.- Street lighting at the Titan Zlatna Panega Cement AD plant.- Street lighting along the Sofia Ring Road.- Design and construction of telecommunications and electricity distribution networks at Metro Stations 9, 10 and 11 on Metro Line II. Projects included: Sofia Metro Extension Project – Lot 2; engineering infrastructure in the area of Metro Station 11-II with an underground car park; reconstruction of the telecommunications network; relocation of communication cables at Metro Station 10 – Lot 2; reconstruction of DC cables supplying the tram network along Cherni Vrah Blvd.; partial power supply for street lighting at Metro Station 10; Lot II between Patriarch Evtimiy Blvd. and Cherni Vrah Blvd.; relocation of a 10 kV power cable at Metro Station 10 on Metro Line II; Obelya Metro Station – Lomsko Shose Blvd. – Nadezhda Road Junction; relocation of the tram line from Lomsko Shose Blvd. along Beli Dunav Blvd. and Gen. N. Zhekov Street; tram line from Tsarevets Street to Rozhen Blvd.; new overhead contact line network; DC cables for Gen. N. Zhekov, Hr. Silyanov, Republika and Rozhen, supplied by Nadezhda Traction Substation; section from Obelya Metro Station to Lomsko Shose Blvd. and Nadezhda Road Junction; relocation of the tram line from Lomsko Shose Blvd. along Beli Dunav Blvd. and Gen. N. Zhekov Street; tram line from Tsarevets Street to Rozhen Blvd.; telephone network installation and reconstruction of existing fibre-optic cables; telephone network installation and reconstruction of the telephone network in the section from Obelya Metro Station to Nadezhda Road Junction, Stage II-B-1, from km 3+100.000 to km 4+139.236.- Power supply in the area of Metro Stations 18–19 on Metro Line I, 150 kV switchgear. Reconstruction of Dragan Tsankov Blvd. between Mitropolit Kiril Vidinski Street and Evlogi and Hristo Georgievi Blvd., including telecommunications, street lighting, traffic lights, low-voltage 1 kV power supply cables and a new duct network.- Reconstruction of Cherni Vrah Blvd. from the intersection with Henrich Ibsen Street / Srebarna Street to the intersection with Todor Kableshkov Blvd., including street lighting, traffic lights, the electricity distribution network, relocation of 10 kV and 20 kV medium-voltage cables, a new PVC duct network, the telephone network with fibre-optic cables, and the telephone network with copper cables.- External power supply: 20 kV cable line and a 20/0.4/0.231 kV, 630 kVA compact transformer substation in the Tvardaka area, within the municipality of Kostinbrod.- Reconstruction of the telephone and electricity distribution networks between km 3+250 and km 5+020 as part of the Sofia Metro First Line extension, Lot 2.- Construction of LOT 2, section from Metro Station 13 (Mladost I, km 15+450.00) to Metro Station 16 (Business Park in Mladost IV, km 18+070.00), LOT 1: section from Metro Station 13 (Mladost I, km 15+450.00) to km 17+000.00. Electrical works: 10 kV medium-voltage and 1 kV low-voltage cables; telecommunications.- Construction and installation works on the telephone network, fibre-optic cables, 10 kV and 20 kV medium-voltage cables and street lighting for Metro Line I, Stage III, Lot 2, section from Metro Station 13 (Mladost I, km 15+450) to Metro Station 16 (Business Park in Mladost IV, km 18+070), Lot 1: section from Metro Station 13 (Mladost I, km 15+450) to km 17+000.- Construction of a road connection above the metro route and Metro Station No. 20 in Druzhba residential district, from the intersection of Krastyo Pastuhov Street and Kapitan Dimitar Spisarevski Street to Obikolna Street – Sofia Metro Extension Project: Stage II – First Line, section Tsarigradsko Shose Blvd. (Metro Station 19) – Druzhba Residential District – Sofia Airport (Metro Station 23). Scope: electricity distribution network, relocation of 1 kV low-voltage cables, new PVC duct network, street lighting and telecommunications, including copper and fibre-optic cables.The company participated in the construction of the Sofia Metro Extension Project, Second Metro Line, section from James Bourchier Metro Station (MS II-11, km 10+452) to Metro Station II-12, with a crossover track beyond it (km 11+752). Scope included telecommunications, fibre-optic cables, street lighting and the electricity distribution network.- Construction of electricity networks, emergency power supply and street lighting for the rehabilitation of Kumata Street and Narcis Street, including the bridge on Narcis Street over the Dragalevska River, Vitosha District.- Rehabilitation of Tsarigradsko Shose Blvd. Subproject 1: rehabilitation from P. Yavorov Blvd. to the overpass above G. M. Dimitrov Blvd., including the overpass above Mihai Eminescu Blvd. / Peyo Yavorov Blvd. and the local south-side carriageway between the overpass above G. M. Dimitrov Blvd. and Alexander Malinov Blvd. Subproject 2: rehabilitation of Tsarigradsko Shose Blvd. from the overpass above Alexander Malinov Blvd. to the Sofia Ring Road, excluding the overpass above Copenhagen Blvd.- Additional design and construction works on Road II-18, Sofia Ring Road, from km 59+400 to km 61+629.18 and from km 0+000 to km 0+780, including the Sofia Ring Road–Slivnitsa Blvd. interchange, Tsaritsa Yoanna flyover, local roads and the main route. Scope: electricity supply, street lighting and telecommunications.- Construction and installation works on Cherni Vrah Blvd., between Flora Kaneva Street and Todor Kableshkov Blvd., covering telecommunications and electrical works.- Installation of lighting, doorbell/intercom and lightning protection systems, as well as modification of existing electrical panels at a multi-family residential building at 25 St. St. Cyril and Methodius Street, Neofit Rilski Building, entrances A, B, C and D, Ruse.- Reconstruction and construction of engineering networks for Sofia Metro Line III, along Botevgradsko Shose Blvd. – Vladimir Vazov Blvd. – Central City Area – Ovcha Kupel residential district, Stage I, from km 4+320 to km 4+950, including one metro station, MS 5.- Provision of temporary external power supply to Metro Station III-6 at Zaimov Park and Metro Station III-8 at Orlov Most, as part of Metro Line III, Lot 3, section from km 6+561.05 (end of Metro Station 8) to km 4+950, including two metro stations and a tunnel section.- Reconstruction and construction of engineering networks at METRO STATION 11.- Reconstruction of Montevideo Street, including street lighting, electrical works and telecommunications.- Reconstruction and construction of engineering networks at METRO STATION 18.- Rehabilitation of the Skutare–Orizovo railway section. Scope: electrical works and external lighting.- Reconstruction of the overpass above the railway line and Slavyanski Blvd., along P. Evtimiy Blvd. in Stara Zagora. Scope: electrical works and telephone network installation.- Construction of street lighting on Tsentralna Street, between Antonin Kolar Street and Promishlena Street.- Construction of street lighting on Promishlena Street, between Ivan Hadzhiyski Street and Tsentralna Street.- “Design and construction of the Sofia Ring Road section from km 35+260 to km 41+340”, from the Tsarigradsko Shose interchange to the Mladost interchange.- Construction of a temporary car park at Metro Station 16, between Montevideo Street and Street 716.- Establishment of fibre-optic connectivity in Mladost 1A residential district, from the technical centre to Block 513 and nearby residential buildings. The routes are constructed within the underground network of the Collectors Service and BTC, in accordance with a previously submitted layout and projects coordinated with BTC.- Reconstruction of the tram track from Knyazhevo terminus to Ruski Pametnik Square, excluding the intersection of Tsar Boris III Blvd. and G. Delchev Blvd.- Reconstruction of the tram track from the Courthouse terminus to Ruski Pametnik Square.- Relocation of the electricity distribution network, street lighting and telecommunications cables for the project involving the drainage channel of Main Branch I along Pavel Krasov Street, up to its discharge into the Shindra River, Gorublyane district, Mladost administrative district.- External power supply with new medium-voltage cables, a new 2 × 800 kVA, 20/0.4 kV transformer substation and new low-voltage cables for a mixed-use building with offices, retail premises, restaurants, residential units, underground and above-ground garages and fencing, located in land property ID 68134.1504.2415, UPI I-1311,1249,1309, Block 504, Druzhba Extension area (Obikolna Street), Iskar District, Sofia.- Reconstruction of the track throats and track layout at Svoge railway station, installation of a new computer-based route interlocking system and modification of the overhead contact line network.- Construction, restoration and renewal of public spaces in Sofia's Central Urban Area – Zone 4.CONSTRUCTION OF PHILIP KOUTEV STREET ACCORDING TO THE REGULATION PLAN, FROM SREBARNA STREET TO SIMEONOVSKO SHOSE BLVD., electrical works.- Construction of Philip Koutev Street between Cherni Vrah Blvd. and Srebarna Street, Stage 3, from km 0+015 to km 0+975, southern carriageway.- Reconstruction of the electronic communications network running through UPI IV-236, Block 13, Tsarigradsko Shose Blvd., 7th km area, Mladost District.- Design and construction of a section of Metro Line III from Shipka Street, through Slatina district, to Tsarigradsko Shose Blvd., including six metro stations, divided into separate lots.- Reconstruction and rehabilitation of road VRC 1082 / III-103 / Mezdra–Bodenets–Krapets–/VRC 1032/, from km 0+000 to km 3+023.41, Section 1 from km 0+000 to km 2+408.12.- “Design and construction of a section of Metro Line III from Shipka Street, through Slatina district, to Tsarigradsko Shose Blvd., including six metro stations, divided into separate lots.” Metro Stations 1 and 2: street lighting, telecommunications and electrical works.- Reconstruction of Opalchenska Street from Alexander Stamboliyski Blvd. to Slivnitsa Blvd., Stage II update, section from Todor Aleksandrov Blvd. to Slivnitsa Blvd.-ELECTRICITY DISTRIBUTION NETWORK, STREET LIGHTING, TELECOMMUNICATIONS – RECONSTRUCTION OF THE TELEPHONE NETWORK- Construction of Eduard Genov Street from control point 72 through control points 101 and 102 to control point 128, Malinova Dolina area, Studentski District – Stage I, including electrical distribution network, street lighting and telecommunications.- Construction of Prof. Zhivko Stalev Street, from Georgi Rusev Street to the connection with the Ring Road, Malinova Dolina, Parts 1–6, Studentski District.- ELECTRICITY DISTRIBUTION NETWORK, STREET LIGHTING, TELECOMMUNICATIONSThe company has also carried out numerous other power supply installations, emergency repairs, internal and external electrical installations and other works.The company provides BULSATCOM AD with professional services in Sofia, including the design, construction, laying, installation and testing of fibre-optic telecommunications cable lines; installation and testing of telecommunications equipment; logistics and/or transport activities; and construction and installation works.The company carries out repair and emergency maintenance activities on the power supply network of NURTS Bulgaria EAD.Equipment: The company owns specialised machinery and auxiliary technical equipment:JCB 1CX EC backhoe loaderHidromek 102B NMK backhoe loaderKomatsu backhoe loaderYANMAR VIO 26-6 rubber-tracked excavatorMercedes-Benz 709 D truckMercedes-Benz 814 L special-purpose vehicleMercedes-Benz 814 K truckMercedes-Benz 711 D truckMercedes-Benz 515 CDI Sprinter truckMercedes-Benz 1223 Atego truckMercedes-Benz 411 CDI truckMercedes-Benz 413 CDI truckMercedes-Benz 311 CDI Sprinter truckVolkswagen Transporter commercial vehicleFord Transit commercial vehicle Peugeot Partner commercial vehicle HIAB 95-2 truck-mounted crane, registration N915PS 406Cable-pulling winchElectrical generatorsVibratory compactorsWater pumpsAngle grindersEquipment for arc weldingHammer drillsHydraulic breakersCable trailer with dollyHydraulic presses for copper cable installation“FITEL S 176” fusion splicer“Fujikura 60S” fusion splicerSingle-mode OTDR OFL280 Flex Tester “Yana 2007” Ltd. enhances the reliability of power supply through the implementation of a mobile cable-testing laboratory system. The mobile laboratory enables comprehensive assessment of cable-line characteristics and fast, accurate fault localisation within the distribution network. This helps prevent emergency situations and reduces the time required to resolve network problems. The company currently operates one specialised mobile cable-diagnostics laboratory system. “We introduce new technologies to ensure European-quality services for our customers. Mobile systems help prevent emergency situations and improve the reliability of power supply, thereby reducing inconvenience for our customers.” The company is able to guarantee high-quality service, reliability, professionalism and adherence to deadlines in the execution, construction and installation of electrical and telecommunications facilities. Cable Sales: Business Division 4: Sale of New 12/20 kV Medium-Voltage Power Cables Available from Stock in SofiaAs a logical and highly specialised extension of our commitment to the energy sector, “Yana 2007” Ltd. offers new medium-voltage power cables for direct sale. All materials are available from stock in Sofia, allowing immediate inspection, prompt loading and dispatch without delays to your project schedule. The cables are brand new, factory-manufactured and stored under optimal conditions on original wooden and metal drums. Available Range and Technical Specifications: 1. NA2XSF2Y 12/20 kV Aluminium Power Cable – 1 × 240 mm² This type of cable is designed for installation underground, in cable ducts and outdoors. It offers excellent mechanical strength and moisture resistance thanks to its polyethylene outer sheath. Total available quantity: 6,380 metres. Factory drum configuration: 5 drums of 1,000 metres each and 1 drum containing 1,380 metres. Current condition: Brand-new factory cables on original drums, stored in a covered, dry warehouse and protected from weather conditions. 2. N2XSF2Y 12/20 kV Copper Power Cable – 1 × 185 mm² High-quality copper cable with cross-linked polyethylene (XLPE) insulation, offering excellent electrical conductivity and low heat losses during medium-voltage power transmission. Total available quantity: 8,920 metres. Factory drum configuration: 8 drums of 1,000 metres each and 1 drum containing 920 metres. Current condition: Brand-new, factory-sealed cables, ensuring that the manufacturer's technical specifications are fully preserved. Flexible Commercial Terms for Investors and Construction Companies: We take an individual approach to every customer and project, offering favourable and transparent terms for business partnerships: Flexible pricing: The final price is negotiable and depends on the order volume and payment terms. Full tax compliance: The company issues the required tax invoice for all purchased quantities. Sales volume: Customers may purchase either the entire available stock or individual drums, depending on the requirements of their specific project. Inspection and logistics support: We offer the opportunity to inspect the products at our warehouse in Sofia. If required, we provide full assistance with arranging specialised transport and loading the cable drums. Certificates and documentation: Each batch is supplied with the relevant declarations of performance, conformity documentation and detailed inventory lists.